Barcelona Breakwall Repair and Dredging
Repaired the Barcelona breakwall and dredged material that entered the harbor through the damaged section of the breakwall.
Repaired the Barcelona breakwall and dredged material that entered the harbor through the damaged section of the breakwall.
Dredged the Federal channel and the Town of Westfield pier and launch area. The project was contracted through and overseen by the US Army Corps of Engineers, as a component of a Lake Erie harbor dredging initiative.
Replaced failing water distribution system with the installation of 3,500 lineal feet of 12” PVC water main, 3,875 lineal feet of 8”, 3,075 lineal feet of 6” PVC, water services, hydrants, and associated appurtenances.
Upgraded various areas of the water system, including; installation of new 8" water main on Bliss Street, new 12" main on West Main Street, new 12" main under Chautauqua Creek from Water Street to West Main Street, new line from an intake in the Chautauqua Creek gorge to the Minton Reservoir, upgrades to the Bliss Street pump station (new pumps, piping and controls), standby generators at the Bliss Street pump station and Water Plant, Water Plant building renovations (new windows, roof, masonry repairs), and Water Plant filter rehabilitation (replacement of filter media, clarifier media cle
6:30 PM - 8:30 PM
6:30 PM - 8:30 PM
6:30 PM - 8:30 PM
6 PM - 8 PM
Meet at "When Pigs Fly" at 6pm for BBB dinner and fellowship.
All are welcome.
Date: Monday, June 25th
Time: 6-7:30pm
Price: FREE
In today’s competitive job market, effective resume and interview skills can open up a variety of opportunities. This Q&A based class will address targeted strategies for resume writing and prepare you for job interviews. Learn how to effectively highlight your knowledge, experiences, and abilities on your resume and during interviews and become better prepared for the “behavior-based” interview approach that employers are most likely to use today.