Barcelona Hamlet Improvements
Designed and constructed streetscape improvements and designed and replaced main waterline.
Designed and constructed streetscape improvements and designed and replaced main waterline.
The Welch Trail is a segment of a 14 mile long shared-use trail known as the "Barcelona to Chautauqua Institution Trail”, which when fully constructed will extend from Lake Erie in the hamlet of Barcelona, New York, to the Chautauqua Institution in the Town of Chautauqua, New York.
5 PM - 8 PM
Come on out for our first vendor event of the season. Do some shopping and enjoy a beautiful sunset on the beach.
Schedule for Monday, June 11th
6:45 – 8:00 A.M. Early Bird Adult Lap Swim
8:20 – 9:05 A.M. Deep Water Aerobics
9:10 – 9:55 A.M. Mod Impact Aerobics
3:00 – 5:00 P.M. Open Swim
5:15 – 6:00 P.M. Deep Water Aqua
The former Portage Inn was a mixed-use structure that had deteriorated in recent years to the point that it was no longer viable for redevelopment.
In 2016 the Westfield Memorial Hospital Foundation launched the Renovate our Emergency Department (RED) Campaign to fund the upgrade of the Westfield Memorial Hospital Emergency Department. Through the RED campaign, generous community donations and a New York State Rural Health Grant funded the project.
Repaired the Barcelona breakwall and dredged material that entered the harbor through the damaged section of the breakwall.
Dredged the Federal channel and the Town of Westfield pier and launch area. The project was contracted through and overseen by the US Army Corps of Engineers, as a component of a Lake Erie harbor dredging initiative.
Replaced failing water distribution system with the installation of 3,500 lineal feet of 12” PVC water main, 3,875 lineal feet of 8”, 3,075 lineal feet of 6” PVC, water services, hydrants, and associated appurtenances.
Upgraded various areas of the water system, including; installation of new 8" water main on Bliss Street, new 12" main on West Main Street, new 12" main under Chautauqua Creek from Water Street to West Main Street, new line from an intake in the Chautauqua Creek gorge to the Minton Reservoir, upgrades to the Bliss Street pump station (new pumps, piping and controls), standby generators at the Bliss Street pump station and Water Plant, Water Plant building renovations (new windows, roof, masonry repairs), and Water Plant filter rehabilitation (replacement of filter media, clarifier media cle